Skip to Main Content
Floor Information
- The first floor of the library is currently under construction. Services and collections previously located on this level are temporarily moved or closed during construction.
- The Learning Commons is now on the second (main) level of the library, across from the library entrance.
- The Periodicals (print) are currently in the construction area, and unavailable. Please use our library home page to search across tens of thousands of online journals, or browse here!
- The Graduate Lounge is now on the 3rd floor, Grasselli side (room 323).
- The Den (coffee bar) is closed until winter 2025.